activTek INDUCT 10000 Manual - Page 6

Browse online or download pdf Manual for Air Cleaner activTek INDUCT 10000. activTek INDUCT 10000 16 pages. Electronic air purification system
Also for activTek INDUCT 10000: Manual (16 pages)

INSTALLATION REqUIREMENTS

1. Unit should be installed after the air handler in the HVAC system.
2. The ductwork around the installation area should be clean and dry to insure
proper connection.
3. Depending on model, one opening (activTek INDUCT 5000) or two openings
(activTek INDUCT 10000) approximately 4" (four inches) (10.16 cm) in diameter
will need to be cut into the existing duct work to install the unit properly.
WARNING: activTek INDuCT should never be installed in a location that will
expose the INDuCT unit to temperatures greater than 200˚F (93˚C).
ELECTRICAL REqUIREMENTS
Wiring of the unit into your HVAC system should be done by a licensed
HVAC installer or electrical contractor only.
For 120 volt unit: Black = L1, White = Neutral, Green = Ground
For 220 volt unit: Black = L1, White = L2, Green = Ground
International Units: Brown = L1, Blue = Neutral, Green with Yellow Stripe = Ground
Unit is shipped with a blunt cord. If required, installation of a UL approved plug
should be done by a qualified electrical contractor.

INSTALLATION CLEARANCES

activTek INDUCT 5000 - Min. 10" x 10"
activTek INDUCT 10000 - Min. 12" x 12"
Air Handler
5