Galaxy Press GS-205B Plus Operation Manual - Page 8

Browse online or download pdf Operation Manual for Power Tool Galaxy Press GS-205B Plus. Galaxy Press GS-205B Plus 13 pages.

Galaxy Press GS-205B Plus Operation Manual

6.Printing And Pressing

Once your equipment has reached the designated start temperature:
Position mug and application and proceed to press.
This procedure will start the automatic timing process.
Please note machine will heat up from start temperature to printing temperature
then time starts to count down.
The timer will automatically count down to zero then circuit board will alarm when
the press cycle is complete.
The timer will automatically re-set and you are ready to continue with the next
application.

7.Switch Between F/C

7.1 Press "set" button for 4 seconds to
enter into second level menu.Display
as below.(see figure 7.1)
7.3, press up and down button to set
value at 0 or 1, 0 for celsius, 1 for
Fahrenheit.
7.1
7.2 Press "set" button to select "SL2"
mode(See figure 7.2)
7.4 Press "set" button 4 seconds to quit.
8
7.2