DCB PTT24 Manual - Page 8
Browse online or download pdf Manual for Network Hardware DCB PTT24. DCB PTT24 12 pages. Push-to-talk lockout device
Also for DCB PTT24: Quick Start Manual (2 pages)
3. Select 12 or 24 Channel Operation
The toggle switch "24< >12" selects either 12 or 24 channels of E&M leads to be controlled by
the PTT24. The left position selects 24 channels, the right position selects 12 channels.
4. Connect the PTT24 Frame/Chassis Ground
Frame ground is on the 48 VDC power connectors, on the 50-pin telco connector shells and
cable tie down screws.
6