Dynaset 90 Installation Manual - Page 11
Browse online or download pdf Installation Manual for Water Pump Dynaset 90. Dynaset 90 16 pages. Hydraulic variable displacement pump
3. Loose the Lock nut A.
4. Adjust the the pressure by turning the adjusting screw B. Follow the readings from
the gauges.
5. After having adjusted the pressure, lock the adjusting screw A
6.
MAINTENANCE
6.1.
MAINTENANCE INTERVAL
All maintenance must be complied with as they are scheduled in this manual.
CHECK POINTS
Hydraulic Oil Level and Quality Check
Hydraulic Oil Filter Change
Hydraulic Oil Change
(check and clean the oil level gauge)
x* Only for a new device after first 100h.
Dynaset Oy | Menotie 3, FI-33470 Ylöjärvi, Finland | tel: +358 3 3488 200 | [email protected] | www.dynaset.com
HYDRAULIC VARIABLE DISPLACEMENT PUMP
DAILY / 10h
x
INSTALLATION GUIDE
100h
750h
x*
x
2 YEARS /
1500h
x
11