Emerson E2 Installation And Operation Manual - Page 16

Browse online or download pdf Installation And Operation Manual for Measuring Instruments Emerson E2. Emerson E2 20 pages. Clarification of the operation of alarm annunciators
Also for Emerson E2: User Manual (17 pages), Quick Reference Manual (2 pages), Quick Setup Manual (2 pages), Quick Start Manual (8 pages), Instruction Manual (12 pages), Quick Start Manual (14 pages), Quick Start Manual (9 pages), Quick Start Manual (14 pages), Quick Start Manual (9 pages), Technical Bulletin (8 pages)

Emerson E2 Installation And Operation Manual
Figure 5-5 - Detailed Data Point Information
Figure 5-6 - Detailed Information if the Data Point Failed
Figure 5-7 - Detailed Information if Data Point is in Override
If no data point is selected when the details icon is
touched, a reminder will appear:
10 • FSD Installation and Operation Guide
Figure 5-8 - Select A Data Point Reminder Screen
If a pointer has not been defined in the E2 application,
a three-dash result will appear. If this three-dash
(- - -) value is selected and the details icon
touched, the following message will appear:
Figure 5-9 - No Pointer Is Defined Message

5.4. FSD Configuration

Configuration Screen
The Configuration screen has four tabs that are used
to configure the FSD. When the tool icon is touched,
the security login screen appears:
is
026-1400 Rev 2 12-APR-10