Galiso HDD-8RB Installation/Operation Instruction Manual - Page 7

Browse online or download pdf Installation/Operation Instruction Manual for Dryer Galiso HDD-8RB. Galiso HDD-8RB 14 pages. With digital control
Also for Galiso HDD-8RB: Instruction Manual (12 pages)

4.0 INSTALLATION

A. Read all instructions and familiarize yourself with the installation blueprints before
attempting to install or operate the HDD Cylinder Dryer.
B. Carefully uncrate the HDD Cylinder Dryer and remove all packing materials.
If there are any missing or damaged parts, please call Galiso, Inc. at 1 (800) 854-
3789 and DO NOT attempt to install any pieces until concerns and possible safety
issues have been discussed.
NOTE: The installation location should insure adequate clearance for unprotected
shop personnel, and close to the power source.
C. To facilitate assembly, lift the Upper Body of the unit with a forklift or hoist.
Position the three Legs beneath the Upper Body. Thread the Legs into the
Upper Body. Lower the Unit to the floor.
D. Bolt the Blower/Motor Assembly to the Leg Brackets.
E. Connect the Flexible Hose from the Blower/Motor to the grey plastic Adapter on
the Upper Body.
F. Take the Cover off of the Control Box. Fasten the Flexible Conduit to the Control
Box and connect the Lead Wires to T1, T2, T3, and Ground, per the schematic
(appropriate to the machines designated voltage and phase) located at the back
of this manual.
G. Once the Dryer has been placed in its' permanent location, bolt to the floor.
H. Connect the Main Power Supply to L1, L2, L3 and Ground, per the schematic
(appropriate to the machines designated voltage and phase) located at the back
of this manual.
I. Test for proper direction of Motor rotation by checking for air, exhausting at the
Manifold Outlets.
NOTE: If rotation is incorrect, disconnect the Main Power Supply and switch the wires
at T1 and T2.
J. Close the Control box Cover.
Section 4 – 1
21-11-1025