Emerson FB2100 Field Replacement Manual - Page 12
Browse online or download pdf Field Replacement Manual for Industrial Equipment Emerson FB2100. Emerson FB2100 16 pages. Flow computer i/o terminal board
Also for Emerson FB2100: Field Replacement Manual (8 pages), Field Replacement Manual (14 pages), Field Replacement Manual (16 pages), Field Replacement Manual (16 pages)
5.
Pull the solar controller cable and battery cable out of the BATT terminals on terminal block
TB2.
6.
Attach the replacement cable(s) to the BATT terminals on terminal block TB2. Follow the
wiring guidelines in the flow computer instruction manual and wire the connections as
shown in the wiring graphic on page 6 (for solar cabling) or page 9 (for battery cabling).
7.
Close the battery compartment and junction box, then close the flow computer enclosure.
Removing/Replacing the Fuse(s)
Flow Computer Fuse Field Installed Accessory Kit Part No. 395829-01-0 for Use with UL Listed Class
I, Division 2, Groups A, B, C, and D Model Series FB2100 and FB2200.
Reference the wiring graphic on page 9 for the fuse.
1.
Open the flow computer enclosure.
2.
Gently pull the cable containing the fuse out so you have access to the fuse holder.
3.
Grasp the widest part of the fuse holder with your thumb and index finger.
FB2100/FB2200 Flow Computer 30W Solar Panel Field Replacement Guide
D301824X012
November 2020
9