Dyness Tower T10 Quick Installation Manual - Page 2

Browse online or download pdf Quick Installation Manual for Battery Pack Dyness Tower T10. Dyness Tower T10 8 pages.

Target Group

Skilled personnel recognized
This manual and the tasks and procedures described herein are intended for use by skilled workers only.
A skilled worker is defined as a trained and qualified electrician or installer who has all of the following
skills and expenence:
Knowledge of the functional principles and operation of on-grid systems.
Knowledge of the dangers and risks associated with installing and using electrical devices and
acceptable mitigation methods.
Knowledge of the installation of electrical devices.
Knowledge of and adherence to this manual and all safety precautions and best oractices.
Please note that this is the quick reference guide only. It is a shortened assistance for the installation
of the Battery HV and does not replace the original installation manual. The original installation
manual must be read and understood completely before installation. Please download and view the
installation manual on this website: www.eft-systems.de (Downloads)
In order to ensure the normal operation of Battery-Box, please be sure to update the firmware to the
latest version and finish the configuration on Battery-Box webpage in accordance with this document.
The system switch must be off before installing.
Please make sure the system switch is off in case of the system not working, and it would be better to
repair it again within one week, avoiding overdischarge or other problems happen.
Please do not stack up batteries without protective package when storing or handling batteries, unless
in the case of installation.

Installation Environment Requirements

Max.
+50
o
C
Tools
Wire Clamp
Phillips Screwdriver
Min.
o
-10
C
Inclinometer
RH.
+5%~+95%
Wrench
Churn Drill