Galvin Engineering Ezy-Drink TD25XEB Manual - Page 4
Browse online or download pdf Manual for Plumbing Product Galvin Engineering Ezy-Drink TD25XEB. Galvin Engineering Ezy-Drink TD25XEB 5 pages.
5. Testing and Flow Adjustment
−
Once the drinking tap has been installed and tested for leaks, the water height may be adjusted to suit
the available pressure as shown above.
−
To adjust water flow
1. Remove the blanking screw.
2. Adjust the water height by turning the regulating screw.
3. Once desired height has been achieved, replace blanking screw.
Note: The full range from minimum flow to maximum flow is only ¼ turn.
Regulating Screw
Blanking Screw
rd
Version 2, 23
March 2021, Page 4 of 5