AGS Parksafe Control Panel Installation & Operation Manual

Browse online or download pdf Installation & Operation Manual for Controller AGS Parksafe Control Panel. AGS Parksafe Control Panel 16 pages. Ventilation control panel
Also for AGS Parksafe Control Panel: Installation & Operation Manual (16 pages), Installation Operation & Maintenance (16 pages), Installation, Operation & Maintenance Manual (20 pages)

AGS Parksafe Control Panel Installation & Operation Manual
Installation & Operation Manual
Parksafe
PARKSAFE
Ventilation Control Panel

Installation & Operation Manual
Please read this manual carefully and retain for future use.
The control panel is designed to be paired with Parksafe Nitrogen Dioxide (NO
) and Carbon Monoxide (CO)
2
gas detectors for installation in car parking facilities and enclosed garages. The control panel will monitor up to
16 gas detectors and automatically control ventilation systems according to gas levels and temperature.
The information contained within this manual should be referenced for typical installation and operation only.
For specific requirements that may deviate from the information in this guide – contact your supplier.
AGS Parksafe Panel - IOM Iss: 6 10-20
1