Galvin Engineering TCS9C80C Installation Manuallines - Page 3

Browse online or download pdf Installation Manuallines for Bathroom Fixtures Galvin Engineering TCS9C80C. Galvin Engineering TCS9C80C 7 pages. Clinilever cp-bs hospital shower set w/ medi hand shower & 900 ss grab rail

Document No.: 001.00.10.16
Product Installation Guidelines
Version 1, 4 November 2022, Page 3 of 7
MOUNTING DETAILS – WALL TOP ASSEMBLY
Wall body
− Wall body must be G5/8" FI and body should be between
0 and 15mm behind the finished wall surface.
80/150 mm Wall Top Assembly
© Galvin Engineering Pty Ltd