Dynisco LMI5000 Installation Manual - Page 3

Browse online or download pdf Installation Manual for Laboratory Equipment Dynisco LMI5000. Dynisco LMI5000 3 pages. For edge_usb

From lab to production,
providing a window into the process
Step 16: Edge device operation and successful communication will be signified by a steady blue LED to the left of
the Cloud Connect label. Note: It can take one minute for the edge device to be in a ready state.
Notes:
·
If the LED to the left of the cloud connect label is flashing, no network can be found. Please check
network settings. If the LED is off, the edge device has an error or isn't running.
·
You will then need to click on the IoT Dynisco Icon "shown above" to setup your Dynisco Cloud Connect
account. You will find instructions on how to register and use the Dynisco Cloud Connect Dashboard on
iot.dynisco.com
·
You can tell if data has been sent by the "Last Sent" line on the Dynisco Edge Device Running console.
·
Yearly subscription prices can be supplied by contacting your regional sales manager with contact info
on
www.dynisco.com
·
Please Remember to Log off Windows on the Edge Device as if you would with any other Microsoft
Computer. Do Not Disconnect Power without Shutting down the Operating System
·
You may need to set the local time zone as you would with any Microsoft Windows Computer on your
network.
38 Forge Parkway
|
Franklin, MA 02038 USA
www.dynisco.com
|
Tel: +1 (508) 541-9400
-3-
|
Fax: +1 (508) 541-6206