Galvin Specialised Safe-Cell 50110C Installation Manuallines - Page 2

Browse online or download pdf Installation Manuallines for Bathroom Fixtures Galvin Specialised Safe-Cell 50110C. Galvin Specialised Safe-Cell 50110C 4 pages. Ezy-grip basin tapware

TOOLS REQUIRED
Power drill
Spanner or adjustable crescent
Thread tape/sealant
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation
instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water
and/or electrical supply conditions must also comply to the applicable national and/or tate standards. Failing
to comply with these provisions shall void the product warranty and may affect the performance of the
product.
1. Fit spout
Fit the Safe-Cell
®
Basin spout into the bench.
Ensure the sealing washer is placed
underneath the base body.
Position the spout to the front and secure
underneath with the supplied flanged back nut.
Take care not to over-tighten.
3. Fit basin bodies to breach
Assemble basin bodies to the copper breach
Ensure the olive is positioned over the copper
breach for sealing.
Tighten the compression nut, taking care not to
overtighten as this may damage the olive.
Version 2, 6 September 2017, 2 of 4
2. Cut copper breach
Measure the distance between the basin
body holes.
Mark out the base copper tee using this
measurement, subtracting 15mm from
each end to allow for the basin body
compression nuts.
Ensure there is an equal distance from the
centre.
Cut to size with pipe cutter and de-burr
both ends.
4. Fit basin body assembly
Insert the basin body assembly up through
the pre-cut holes.
Centre the basin bodies.
Carefully insert the copper breach into the
spout to avoid damage to the o-rings.