AGS Parksafe Control Panel Installation Operation & Maintenance - Page 11
Browse online or download pdf Installation Operation & Maintenance for Control Panel AGS Parksafe Control Panel. AGS Parksafe Control Panel 16 pages. Ventilation control panel
Also for AGS Parksafe Control Panel: Installation & Operation Manual (16 pages), Installation & Operation Manual (16 pages), Installation, Operation & Maintenance Manual (20 pages)
Installation, Operation & Maintenance
Operation
First Power Up
Upon connecting mains power, the Parksafe control panel will load for approximately 60 seconds. During this time the
screen will display an 'initialising' screen. The panel will then begin establishing signals with any Parksafe gas detectors.
Home Screen Overview
System OK.
Under normal/safe conditions.
System in 'Pre-Alarm' condition.
When detected gas reach pre-alarm levels.
OUTPUT 1 relay: activated.
0-10V output: 5V
Other external devices may activate if configured to do so.
System in 'Alarm Delay' condition.
When detected gas reach dangerous alarm levels.
OUTPUT 2 relay: activated.
0-10V Output: 10V
Other external devices may activate if configured to do so.
System in Alarm condition.
When gas levels remain dangerous beyond the alarm delay.
ALARM relay: activated.
Gas detector ID appears on screen.
The internal buzzer will sound to alert the user.
The detector ID of the first signal received will be displayed on screen only
All outputs will remain active until the system is reset.
Temperature Status & Icon
This feature is factory set to off.
If enabled and the temperature levels exceed the selectable threshold, the
temperature icon appears and the system switches both OUTPUT 1 & 2, the
Damper relay and the 0-10V output at 10Volts.
All outputs will remain active until the temperature (monitored by Parksafe Detectors) drops below 4°F of the specified
threshold – adjustable in the configuration settings menu.
Rev: 13
0721
Parksafe Control Panel
.
11