AFL Hyperscale U Series Installation Manual - Page 5

Browse online or download pdf Installation Manual for Industrial Equipment AFL Hyperscale U Series. AFL Hyperscale U Series 16 pages. Front-access v-panel
Also for AFL Hyperscale U Series: Installation Manual (8 pages), Installation Manual (8 pages), Installation Manual (8 pages), Installation Manual (12 pages), Installation Manual (8 pages), Installation Manual (8 pages), Installation Manual (20 pages), Installation Manual (17 pages), Installation Manual (20 pages), Installation Manual (16 pages)

AFL Hyperscale U Series Installation Manual

Panel Mounting

Activate black lever to detach slide rail
1
Slide out drawer and de-latch rail.
Partially tighten cage nut screws in positions
3
shown using screwdriver.
Series
U-Series 2RU Front-Access V-Panel (FVP)
1RU
2RU
1RU
Insert cage nuts in positions shown on both
2
left- and right-hand-side of rack.
4
Insert 2RU panel into 19" rack, insert and
tighten all cage nut screws.
© AFL Hyperscale. All rights reserved
5