AFL Hyperscale U Series Installation Manual - Page 12

Browse online or download pdf Installation Manual for Storage AFL Hyperscale U Series. AFL Hyperscale U Series 17 pages. Front-access v-panel
Also for AFL Hyperscale U Series: Installation Manual (8 pages), Installation Manual (16 pages), Installation Manual (8 pages), Installation Manual (8 pages), Installation Manual (12 pages), Installation Manual (8 pages), Installation Manual (8 pages), Installation Manual (20 pages), Installation Manual (20 pages), Installation Manual (16 pages)

AFL Hyperscale U Series Installation Manual
Cable Installation
Re-fit drawer cover, ensuring cable braid tail
20
passes though cut-out. Use cut-out on right-
hand-side for alternate side cable entry.
Slide drawer back out to fully extended, gently
22
pull braid tail to straighten, and make slack
coil, securing with Velcro as shown.
12
© AFL Hyperscale. All rights reserved
Ensure drawer runners
are retracted
Ensuring drawer runners are retracted, slide
21
spliced drawer into runner of 2RU panel – an
audible click sounds when runners are engaged.
Push/Pull Handle
Push drawer back into panel so that it is fully
23
retracted.
Series