Gree RVA-135R Owner's Manual Operation & Installation - Page 17
Browse online or download pdf Owner's Manual Operation & Installation for Air Conditioner Gree RVA-135R. Gree RVA-135R 20 pages. Recreational vehicle air conditioner
- 1. Air Conditioner
- 1. 1 A few Words about Your New Air Conditioning Unit
- 1. Electrical Data
- 2. Table of Contents
- 2. 2 Electric Diagram
- 3. 3 Packing List
- 4. 4 Specifications
- 5. 5 Operation of Wireless Remote Control
- 6. 6 Control Panel
- 7. 7 Installation Instruction
- 7. Step 1-Selecting an Installation Location & Installing the Roof Top Air Conditioner
- 7. Step 2-Installing the Ceiling Assembly
- 7. Step 3-Electrical Wiring
- 7. Step 4-Completing the Installation
- 8. 8 Troubleshooting Guide
- 9. 9 Normal Maintenance Procedures
STEP 4-COMPLETING THE INSTALLATION
To complete the installation and system checkout requirements, the following steps must be
performed.
1.
Check the thermostat position. Make sure the thermostat is routed through the holding guide
and is not touching any metal surface.
2.
Make sure the guide louver and the filters are properly positioned in the ceiling grille.
3.
Secure the ceiling grille to the ceiling assembly frame with 4 screws.(see Figure 10).
4.
Switch on the power supply and check the unit work or not.
4 Screws
Figure 10
- 15 -
Frame
Ceiling Grille