Gree HLR10Pd/Na-K Unit Installation Manual - Page 13

Browse online or download pdf Unit Installation Manual for Chiller Gree HLR10Pd/Na-K. Gree HLR10Pd/Na-K 18 pages. Mini chiller

Gree HLR10Pd/Na-K Unit Installation Manual
WARING!
Normal Open type should be connected to wire (ON) and wire (N)for valve closing in cooling mode.
Normal Closed type should be connected to wire (OFF) and wire (N)for valve closing in cooling mode.
(ON) : Line signal (for Normal Open type) from PCB to 2-way valve
(OFF) : Line signal (for Normal Closed type) from PCB to 2-way valve
(N) : Neutral signal from PCB to 2-way valve
The 2-way value 2 is reserved without any control program. At the field installation, it should be wired at the
terminal board of the 2-way valve 1.

4.9 Wired Controller

Wired controller wiring guidance:

4.10 Wiring of Other Auxiliary Heat Sources

Other auxiliary heat sources are allowed for the equipment and controlled in such a way that the mainboard
will output 230V when outdoor temperature is lower than the set point for startup of the auxiliary heat source.

4.11 Wiring of the Gate-Controller

If there is gate control function,installation guide follow as:
(1) HLR8Pd/Na-K, HLR10Pd/Na-K
(2) HLR12Pd/Na-M, HLR14Pd/Na-M
13
14
XT2
N
Other Thermal
XT3
1
2
Gate-Controller
XT4
5
6
Gate-Controller
11
Unit Installation