Gamma ST II Owner's Manual - Page 10
Browse online or download pdf Owner's Manual for Accessories Gamma ST II. Gamma ST II 17 pages.
STRINGING THE FRAME
Weaving the Cross Strings
Weave the cross strings over and under the main strings
being careful to alternate the weave direction of each
consecutive cross string so as to be opposite of the
previously installed cross string.
Once the final cross string is tensioned and clamped, tie
off at the appropriate hole specified by the racquet
manufacturer.
9