Avantco 177AG36RC Installation Operation & Maintenance - Page 6

Browse online or download pdf Installation Operation & Maintenance for Commercial Food Equipment Avantco 177AG36RC. Avantco 177AG36RC 17 pages. Manual griddles, radiant charbroilers, hot plates

Avantco 177AG36RC Installation Operation & Maintenance
Instructions are for conversion from Natural Gas to Propane (L.P.) on all models. The
conversion should be done before connecting the unit to the gas supply.
Units are shipped from the factory equipped for use on natural gas. Orifices necessary for LP
(propane) are provided in a bag tied to the valve on the front panel.
1. Remove the trivets from the top
of the appliance.
2. Remove the burner from the top
of the gas pipe.
3. Replace the orifice fittings into
the valve. Note: Unit Number on
side of orifice fittings.
4. Install the front panel knobs.
5. Before installing the regulator,
unscrew the octagonal cap,
up you can read (NAT) on the
plastic insert out of the cap, flip
it over and snap back in.
6. Continue with installation.
Page |
6

CONVERSION

Orifice Fittings
Regulator with Brass Cap
L.P Position of Insert
Plastic Insert