Green Sun HydroFalls Product Manual - Page 11

Browse online or download pdf Product Manual for Lawn and Garden Equipment Green Sun HydroFalls. Green Sun HydroFalls 15 pages.

Check the level of the brackets using a spirit level prior to tightening all the mounting screws. It is important to get
the horizontal level correct so the water flow within the system operates correctly. Refer to. Slide the wall pot body
over the top of the mounting brackets. Refer to (Fig.5 & 5.1 & 5.2)
Fig.5
2
Water level indicator installation
To install the water level indicator, please remove the thin plastic on the side of the unit with the puncher
(either left or right, Fig.6).
Insert the water level indicator from the outside of the unit (making sure the "O-ring" is on the outside) and secure
the plastic nut from the inside (Fig. 6.1).
To remove the indicator please install the side plug which come with the package.
Place the puncher onto the slot
either left or right side of the planter.
Do not hold the puncher while
using the hammer.
Fig.6
05
Fig.5.1
Fig.5.2
Fig.6.1

Multiple unit Installation

1
Mounting Brackets Installation
A
Wall
Vertical Installation for 2 or More Units
Installation sequence as shown below:
Mark on the wall the first unit with 4 hole positions
(281mm x 90mm apart). Then mark the same hole
positions 91mm above the below unit. Refer to (Fig. 7)
Start with the lowest level mounting Brackets installation,
then slide the planter body over it . Make sure there is
enough space for the planter to slide in. The lower level
must be finish before the user can start with the upper
level installation.
Vertical Installation sequence
1st flower pot
(Not Included)
or
Wall
Rack
A
B
281 mm
90 mm
3rd flower pot
91 mm
90 mm
2nd flower pot
91 mm
90 mm
1st flower pot
47.5 mm
Fig.7
144.5 mm
3rd flower pot
2nd flower pot
2nd flower pot
1st flower pot
1st flower pot
EN
06