Green Tools GT-CDL20 User Manual - Page 14

Browse online or download pdf User Manual for Power Screwdriver Green Tools GT-CDL20. Green Tools GT-CDL20 20 pages.

14
www.euromasterbg.com
Set the ring (3) to a specified torque value.
We recommend that you start lower-torque operation.
The torque should be increased gradually until the desired result is obtained.
To unscrew screws, larger values must be selected.
To drill holes, the setting marked with a drill bit must be selected. With this setting, the cordless drill works at the highest
torque value.
5.6. Shifting speeds.
The battery drill has a gear selector (7) enabling the torque range to be increased when changing torque.
I Speed: lower revs, higher torque;
II Speed: higher revs, lower torque.
Depending on the operation, the gear selector must be set to the appropriate position. If it can not be moved, the spindle
must be slightly rotated.
Do not change the position of the gearshift during operation of the cordless drill. This will cause damage to the power
tool.
5.7. Placing the work tool.
Move the direction switch (2) to the center position.
By holding the rear ring of the chuck and turning the front ring to the right, the desired opening of the jaws is required
to fit a drill or nozzle.
The drill or tip is inserted in the hole of the chuck.
Holding the rear ring, the front ring is rotated to the left and heavily tightens.
The tool is disassembled in a sequence opposite to its installation.
When attaching the drill or nozzle to the chuck, attention must be paid to the correct orientation of the tool. When using
short screwdriver bits or bits, an additional magnetic extension should be used.
5.8. Direction of rotation left and right.
The direction of rotation of the spindle is selected by means of the direction switch (2).
Rotate to the right - set the switch (2) to the extreme left position.
Rotate left - set the switch (2) to the far right position.
It is not allowed to change the direction of rotation when the spindle of the cordless drill rotates.
5.9. Drilling.
When a large diameter hole is to be drilled, it is recommended to drill a smaller hole first, then be punched to the desired
size. This will prevent overloading the drill. Drilling of deep holes should be done gradually by removing the bore from the
hole periodically to remove chips or dust. If the drill bit lands in the hole during drilling, the drill must be stopped immediately.
Use the change of rotation direction to remove the drill from the hole. The drill must be aligned with the drill hole. Ideally, the
drill must be placed perpendicular to the surface of the workpiece. If the condition of perpendicularity is not observed, it may
result in jamming or breaking of the drill in the hole as well as injury to the user. Continuous drilling at low speeds threatens
the engine with overheating. Periodic breaks should be made at work or the drill should be allowed to work at maximum
speed without load for about 3 minutes. Do not cover holes in the housing for ventilation of the motor.
5.10. Make periodic breaks in work.
5.11. Store and handle the accessories carefully.
5.12. Do not throw the tool, overload it, immerse it in water or other liquids, do not use it to mix adhesive and concrete
solutions.
6. Service and maintenance.
The drill case should be wiped with a piece of soft tissue. Any cleaner should not be used as it may cause damage to
the drill case.
6. Operation and maintenance.
Clean the body with dry cloth. Do not use any cleaning agents, as they may damage the casing.
6.1. Drill chuck replacement.
Quick-release chuck is screwed onto spindle of the drill and additionally secured with a screw.
Set the direction selector switch (2) in middle position.
Open chuck jaws.
Unscrew the fixing screw with cross screwdriver by turning it clockwise (left-hand thread).
Install hex key in the chuck.
Gently tap the second end of the hex key.
Unscrew the chuck.