BERNHARDT design a.k.a. C-base Instructions Manual - Page 3

Browse online or download pdf Instructions Manual for Indoor Furnishing BERNHARDT design a.k.a. C-base. BERNHARDT design a.k.a. C-base 20 pages.

BERNHARDT design a.k.a. C-base Instructions Manual
Step 3
The Workwall Structure must be installed starting at the
highest point of the floor. Once the side to side location
of the Workwall is determined, place the provided height
spacer block in the corner at the predetermined
highest point of the floor.
Standard Workwall configuration – 7 7/8" / 200mm above the high spot.
Electrical Workwall Configuration – 21 7/8" / 556mm above the high spot.
Step 4
Place the first Workwall Structure piece on the
height spacer block.
Step 5
Using the vertical and horizontal laser guides, align the first
Workwall Structure section. It is very critical that this
first section is mounted level.
Step 6
Once the first section is leveled, temporarily attached
the Workwall Structure section to the wall using drywall
screws. This will temporarily keep the panel in position
for marking the location of the wall anchors.
September 2012