CORNING SCF-1728 Manual - Page 13

Browse online or download pdf Manual for Laboratory Equipment CORNING SCF-1728. CORNING SCF-1728 14 pages. Heat shrink open ribbon system (hs-ors) canister splice closure

CORNING SCF-1728 Manual
APPENDIX A
Drop Port Cables
IMPORTANT:
If the cable used is made with a metal central/strength member, use the grounding connector as
for the armored cable, with the extension bracket to strain-relieve the central/strength member
and ground it.
Step 1:
Remove nuts from the ground clamp.
Step 2:
Attach the extension bracket, then the top plate (Figure 29). Tap
the top plate to set the teeth into the cable.
Step 3:
Tighten clamp using one nut.
Step 4: Trim the central/strength member slightly shorter than the top of
the extension bracket (Figure 30).
(When strength member is metal, bend it over the slots in the
extension bracket as shown in the inset in
trim excess strength member.)
Step 5:
Wrap the strength member yarn around the restraint cap stud
(Figure 31). Position the cap behind the extension bracket.
Strength member
TPA-5994
For small strength members (less than 3mm in diameter)
Step 1:
Insert the restraint cap threaded stud through the upper hole in the strain-relief bracket, capturing
the strength member between the two.
Step 2:
With the strength member behind the bracket, install a nut on the restraint cap threaded stud
(Figure 31).
Step 3:
Secure the cap to the extension bracket using the supplied nut (Figure 31). Confirm that all buffer
tubes are clear of the strength members and tighten securely.
Figure 30
and then
Metal
strength member
Figure 30
Standard Recommended Procedure 206-455-AEN | Issue 1 | November 2018 | Page 13 of 14
TPA-5993
TPA-5995
Figure 29
Figure 31