b. Carefully pull the scored tube apart. Remove both sections of
the tube at the other ring cut (Figure 19).
7.11
For gel-filled cables, use a lint free tissue or cloth to wipe the
filling compound from each ribbon or fiber. If cleaner ribbons or fibers
are desired, filling compound remover may be used.
7.12
Separate and clean the fiber bundles or ribbons by following
the appropriate cable stripping procedure.
7.13
Mount the cable in the prepared closure or terminal end
cap along with the drop cable (Figure 20). Refer to the instruction
manual provided with the closure for complete loading procedures.
BE EXTREMELY CAREFUL NOT TO DAMAGE THE EXPOSED FIBERS OR
RIBBONS DURING THIS STEP.
Distribution cable bers
8.
Preparing the Fibers for Splicing
Complete the cable splicing and installation according to the
instructions for the particular terminal or closure being installed.
Drop cable ber (s)
Standard Recommended Procedure 004-074 | Issue 12 | May 2017 | Page 14 of 18
Figure 19
Figure 20