CORNING EDGE Manual - Page 11

Browse online or download pdf Manual for Racks & Stands CORNING EDGE. CORNING EDGE 11 pages. Single-module housing
Also for CORNING EDGE: Installation (4 pages)

Step 12:
Route the other end of the jumper to its destination.
NOTE:
Jumpers may route out one or both sides of the box as shown in Figure 16.
Step 13:
Close and secure the cover on the box. Replace and secure floor tiles.
6.
INSTALLATION
OPTIONS
The top module rack may be
removed from the module frame
(Figure 19) to allow installation
of a 1U patch panel (fiber or
copper), if desired.
7.
CONNECTOR CARE AND CLEANING — POST INITIAL MATING
NOTE:
Connector care and cleaning should only be necessary after the initial connector mating during
testing and troubleshooting of the network.
a. Clean connectors and adapters using the recommended cleaning tools or kits for the connector
type.
LC connector and adapter cleaning: use cleaning tool part number CLEANER-PORT-LC
MTP connector and adapter cleaning: use cleaning tool part number 2104466-01
b. Always keep dust caps on connectors and adapters when not in use.
c. Ensure dust caps are clean before reuse.
d. When troubleshooting, clean the connector before re-mating, especially for test equipment patch
cords (jumpers).
Be sure to clean both connectors that are being mated.
Corning Optical Communications LLC • 4200 Corning Place • Charlotte, NC 28216 USA
800-743-2675 • FAX: 828-325-5060 • International: +1-828-901-5000 • www.corning.com/opcomm
Corning Optical Communications reserves the right to improve, enhance, and modify the features and specifications of Corning Optical Communications products without
prior notification. A complete listing of the trademarks of Corning Optical Communications is available at www.corning.com/opcomm/trademarks. All other trademarks are the
properties of their respective owners. Corning Optical Communications is ISO 9001 certified. © 2012, 2020 Corning Optical Communications. All rights reserved
STANDARD RECOMMENDED PROCEDURE 003-825-AEN | ISSUE 7 | NOVEMBER 2020 | PAGE 11 OF 11
Figure 19