Align APS030-2200 Operation Manual - Page 7

Browse online or download pdf Operation Manual for Industrial Equipment Align APS030-2200. Align APS030-2200 14 pages. 100,000 lbs. capacity battery powered tugger

PTT6 Power Tugger
7
IV. Sequence of Operations
As operator, you are responsible that no one is in harm's way whilst you are
operating the transporter.
Starting the Equipment
Turn the key switch on the handle when it is in its upright position.
Check the battery indicator to make sure the PTT6 is charged and ready for use.
Push the "lift cylinder down" button to assure that the cylinder is in its lowest position.