AEG 61000M Installation And Operating Instructions Manual - Page 16

Browse online or download pdf Installation And Operating Instructions Manual for Hob AEG 61000M. AEG 61000M 24 pages. Ceramic glass hob
Also for AEG 61000M: Installation And Operating Instructions Manual (32 pages)

AEG 61000M Installation And Operating Instructions Manual

Electrical Connection

• Before connection, check whether the nominal voltage of the appli-
ance, the voltage stamped on the nameplate, is in agreement with
the available supply voltage and the nominal voltage of the combi-
nation appliance. The nameplate is situated on the under-covering of
the cooking surface.
• Bring the connection plug of the cooking unit together with the cor-
responding parts of the built-in stove or switchbox and connect them
tightly. Ensure that the connection cables are routed along the side of
the oven.
1
Following connection to the mains supply, all cooking zones must be
switched on, at the maximum setting, one after the other for approx.
30 seconds to check that they function correctly.
34