Kohler BELAY K-23769T-RCP Installation Instructions Manual - Page 8

Browse online or download pdf Installation Instructions Manual for Bathroom Fixtures Kohler BELAY K-23769T-RCP. Kohler BELAY K-23769T-RCP 23 pages.

Kohler BELAY K-23769T-RCP Installation Instructions Manual
·
Raise the bath by positioning 2 pieces of wood
blocks under the metal frame and ensure there is
enough space for the drain. (For K-156T-LCP/RCP)
·
Install the drain to the bath according to the
installation instructions included in the box
containing the product.
·
Carefully push the bath into the alcove confirm that
the drain connections line up with the drain, and
then remove the wood blocks.
4. Install Gap Panel Supports
NOTICE: Complete these steps only if you will use the
provided gap panel to fill a gap between the bath rim
and the walls.
·
Draw a line on the back and drain-end alcove walls,
even with the top of the bath rim.
·
Measure the thickness of the gap panel, then
measure and mark this distance underneath the first
set of lines drawn on the walls. You will use this
bottom set of lines to position 2 support pieces.
·
Cut two straight pieces of 2 lumber, one to fit along
the back wall and another along the drain-end wall.
Or use bracket panel K-23772T (the options)
mounting on the wall.
·
Using a fastening method appropriate for the wall
and framing materials, secure the 2X4's firmly or
bracket panel K-23772T in place at the bottom set of
pencil lines.
Carpenter's Square
1397340-T01-A
·
(
·
·
Wood Blocks
4.
·
·
2
·
2
(
)
·
K-23772T(
Lumber
First Line
Gap Panel
Thickness
Second Line
-8-
2
K-156T-LCP/RCP)
(For K-156T-LCP/RCP)
(
K-156T-LCP/RCP)
)
Bracket Panel(K-23772T-*)
(K-23772T-*)
First Line
Second Line
K-23772T
2
Gap Panel
Thickness