Kohler 71120120-96 Installation And Care Manual - Page 12
Browse online or download pdf Installation And Care Manual for Bathtubs Kohler 71120120-96. Kohler 71120120-96 45 pages.
Construya la estructura de postes de madera (cont.)
Asegúrese de que los postes de la estructura estén a plomo y a escuadra con una
tolerancia de 1/8" (3 mm). Si no se alcanzan estas tolerancias, será necesario
utilizar cuñas.
Si es posible, construya un panel de acceso en la pared lateral que tiene las
conexiones de plomería para simplificar el mantenimiento futuro de todas las
conexiones de plomería.
Prepare the Subfloor
IMPORTANT! The bath supports must rest directly on a level subfloor.
IMPORTANT! Squeaking may develop if the bath is installed over a subfloor other
than plywood. In order to prevent squeaking, place a pad between the bath and the
subfloor and positioned under the bath supports. We recommend that the pad be
made of spun bonded polyester landscape fabric or spun bonded house wrap
material. Do not use roofing felt.
IMPORTANT! The drain line must be installed in accordance with the drain
manufacturer's instructions. Locate the drain line and trap using the dimensions
given in the "Roughing-In" section.
For above-the-floor drain installations, cut the hole in the floor for the drain line.
For through-the-floor drain installations, cut the hole in the floor for the drain
assembly. The drain connection should be made directly under the overflow drain.
Leave room to connect the piping.
Ensure that the apron flanges can be secured to the studs or install three 2x4
blocks just behind the apron location.
Verify the subfloor is level. If the subfloor is not level, proceed to the "Level the
Subfloor" subsection below.
Level the Subfloor
IMPORTANT! If you intend to install this product using a mortar cement bed, do not
level the subfloor at this time. Proceed to the "Install the Rough Plumbing" section of
this installation guide.
IMPORTANT! Mortar cement is required to level an uneven subfloor. Do not use
plaster, gypsum cement, or drywall compound for this application, as these materials
do not provide adequate structural support.
Spread a layer of mortar cement on the subfloor where the bath supports will be
located.
Préparer le plancher
IMPORTANT! Les supports de la baignoire doivent reposer directement sur un sol
nivelé.
IMPORTANT! Des grincements peuvent avoir lieu si la baignoire est installée sur un
plancher autre que contreplaqué. Pour éviter les grincements, placer un patin entre la
baignoire et le plancher et sous les supports de baignoire. Nous recommandons un
patin fait en polyester filé pour jardinage ou matériau de couverture de maison. Ne
pas utiliser de goudron.
IMPORTANT! La ligne du drain doit être installée conformément aux instructions du
fabricant. Localiser la ligne du drain et le siphon en utilisant les dimensions données
dans la section "Raccordement" de ce guide.
Pour les installations de drain au-dessus du sol, découper le trou dans le sol pour
la ligne du drain.
Pour les installations de drain dans le sol, découper le trou dans le sol pour la
ligne du drain. La connexion du drain devrait être effectuée directement sous le
drain du trop-plein. Laisser de l'espace pour connecter la tuyauterie.
1064910-2-A
12
Sterling