Kohler Hourglass 30 K-1201 Installation Instructions Manual - Page 11
Browse online or download pdf Installation Instructions Manual for Bathtubs Kohler Hourglass 30 K-1201. Kohler Hourglass 30 K-1201 20 pages.
9. SITE REQUIREMENTS
A. OLD BATH REMOVAL
Disconnect the drain at the trap. Remove the old wall
material. Slip boards under the old bath feet to
protect the floor and slide the old bath out of the recess
as illustrated.
B. SUBFLOOR PREPARATION
Check the flooring under the bath, and make repairs as
needed. Make sure the subfloor is level.
C. STUD POCKET PREPARATION
Possible stud frame arrangements are illustrated below.
Use the stud construction appropriate for your particular
whirlpool model. Some modifications may be needed for
other types of construction, if preferred.
If an apron wall without a ledge is desired, the finished
apron wall surface must be 1/16" under the bath rim.
1.
Recommended For K-1201, K-1206, K-1211,
K-1216, and K-1221 Drop-In Models:
Corner Installation: The suggested stud construction
is illustrated.
2.
Recommended For K-1201, K-1206, K-1211,
K-1216, and K-1221 Drop-In Models:
Recess Installation: The suggested stud construction
is illustrated.
Kohler Co., Kohler WI
Old Bath
11
Floor
Protection
Boards
1/16" Gap
Between
Whirlpool
Whirlpool
Rim
Rim and
Framing
1/16" Gap
Between
Whirlpool
Whirlpool
Rim
Rim and
Framing
EA
113867-2-
(-)