Kohler ADAIR K- 4983T-ITSE Installation Instruction - Page 6
Browse online or download pdf Installation Instruction for Toilets Kohler ADAIR K- 4983T-ITSE. Kohler ADAIR K- 4983T-ITSE 10 pages. 4.2l skirted class five+ one-piece toilet+ cl
Install the tank lid and the seat. Use
the supplied hardware pack for seat.
Periodically check for leaks for several
days following the installation.
FILL FLOAT WITH
BALLAST
Test flush the toilet.
Periodically check all connections for
leaks for several days following
installation.
Set the tank cover in place on the tank.
MINOR ADJUSTMENT OF
WATER LEVEL
Move the snap along "OPEN" direction.
To lower water level: Move water cup
down to a proper height and rotate
screw anticlockwise to achieve the
desired water level. (Refer to float
adjustment instructions.)
To elevate water level: Rotate screw
clockwise and raise float to the desired
water level. Elevate water cup to a
proper position as well. (Refer to float
adjustment instructions.)
1423356-T01-B
Fig.#13
13
Fig.#14
14
Snap
SCALE
5:1
Fig.#15a
15a
Screw
Fig.#15b
15b
Fig.#15c
15c
-6-
OPEN