Kohler Escale K-23076T-BNS Installation Instructions Manual - Page 24
Browse online or download pdf Installation Instructions Manual for Toilets Kohler Escale K-23076T-BNS. Kohler Escale K-23076T-BNS 28 pages. Floor standing toilet
Also for Kohler Escale K-23076T-BNS: Installation Instructions Manual (23 pages), Installation Instructions Manual (11 pages)
2) K-23055T-PNE access panel installation and installation
hole size
2) K-23055T-PNE
There is only remote installation with K-23055T-PNE,
During remote installation, fix the cover onto the tank
and pull the air hose to the panel. Reserve access panel
at front to ensure removal and installation of cover.
Recommended installation hole size of
+2
+2
146
X 41
mm
.
0
0
7. Insert the inlet pipe and drainage pipe into the bowl, and
then adjust the syphon and drainage pipe to a proper
position to be fixed into the bowl. Make sure of the
positions of syphon and discharge elbow and then remove
the bowl.
7.
8. When finishing the brickwork, eliminate unwanted part of
the mask, the drainage pipe and the inlet pipe, if there is
mask.
8.
9. Fix faceplate according to step E and then it is ready for
use.
Note:
Reserve access panel at front or top of the tank in
remote installation.
9.
E
1402749-T01-A
+2
+2
146
X 41
mm
0
0
+2
41
0
Pinch Plate
+2
146
0
Wall Thickness 7~40mm
Discharge Elbow
Mask
Drainage Pipe
Full
Flush Button
Finished Installation Illustration
-18-
At least 80mm gap reserved
Adjust length of
pinch plate in
accordance with
wall thickness
7~40mm
Syphon
Inlet Pipe
Drainage Pipe
Inlet Pipe
Half Flush Button
80mm