Kohler ESCALE K-25449T-NS Installation Instructions Manual - Page 16

Browse online or download pdf Installation Instructions Manual for Toilets Kohler ESCALE K-25449T-NS. Kohler ESCALE K-25449T-NS 28 pages. Floor standing toilet

C. Method four: Cut apart the cable of the air hose. Pull
it out from the front of the tank and meanwhile
reserve the access panel. Fix the four plates with
screws and then fix the support board.
Note:
No direct contact between the faceplate and the
tank.
7~20mm thickness recommended for the wall of
the pinch plate.
Recommended installation hole size of
+2
201
X
136
0
C.
2) K-23055T-PNE access panel installation and installation
hole size
2) K-23055T-PNE
There is only remote installation with K-23055T-PNE,
During remote installation, fix the cover onto the tank
and pull the air hose to the panel. Reserve access panel
at front to ensure removal and installation of cover.
Recommended installation hole size of
+2
+2
146
X 41
mm
.
0
0
C. Installation of P-trap
C.
1. Insert drainage pipe with inner diameter
drain elbow and weld.
1.
1402749-T01-A
+2
mm to remote plate installation.
0
7~20mm
+2
+2
201
X
136
0
Pinch plate installation
Pinch plate
Supporting Board
+2
+2
146
X 41
mm
0
0
110mm into
110mm
Air hose
mm
0
Air hose
Screw
Faceplate
+2
41
0
146
-10-
Method four:
Press from front
Pinch plate
Finished wall
Pinch plate
7~20mm recommended
Finished wall
Supporting
80 3mm gap reserved
Board
Pinch Plate
+2
0
Wall Thickness 7~40mm
7~40mm
80 3mm gap reserved
80 3mm
7~20mm
80 3mm
At least 80mm gap reserved
80mm
Adjust length of
pinch plate in
accordance with
wall thickness
Water Tank Bracket
Drainage Pipe