Kohler 10RESV Installation Manual - Page 24

Browse online or download pdf Installation Manual for Portable Generator Kohler 10RESV. Kohler 10RESV 48 pages. Residential/commercial generator sets
Also for Kohler 10RESV: Installation Instructions (2 pages)

Kohler 10RESV Installation Manual
1.10.2 Communication Cable
Specifications
RBUS Connections A and B
For the RBUS communication connections A and B to
the Model RXT transfer switch, optional PIM and/or
optional load shed kit, use 20 AWG shielded,
twisted-pair communication cable. Belden #9402
(two-pair) or Belden #8762 (single-pair) or equivalent
cable is recommended.
For outdoor installations, including those with buried
cables and/or conduit, use outdoor-rated Belden
#1075A or equivalent 20 AWG shielded, twisted-pair
communication cable.
Cable Size for PWR and COM Connections
20 AWG Belden #9402 or equivalent, two-pair
20 AWG Belden #1075A or equivalent, two-pair
14 AWG *
12 AWG *
* Use 12 or 14 AWG cable for PWR and COM connections only. For RBUS connections A and B, use shielded, twisted pair communication
cable specified in Section 1.10.2.
Figure 1-22 Total Cable Lengths for PWR and COM Connections
24
Section 1 Installation
PWR and COM Connections
For the PWR and COM connections from the generator
set to the RXT, PIM and/or load shed kit, use the second
pair in the two-pair communication cable for short runs,
or use 12--14 AWG cable for longer runs as shown in
Figure 1-22.
The maximum cable length depends on the number of
optional modules connected. A module can be a Model
RXT transfer switch, a load management device, or a
programmable interface module (PIM). See Figure 1-22
for the maximum cable lengths for 1, 2, or 3 modules per
cable run. Note the shield connections shown in
Figure 1-24.
Note: A model RXT transfer switch with combined
interface/load management board acts as two
RBUS modules: one RXT transfer switch and one
load management device.
Note: Power relay modules, if used, are not RBUS
modules and do not have RBUS communication
connections.
Maximum length per run, meters (ft.)
Number of Modules (ATS, PIM,
Indoor or
Outdoor In-
1 Module
stallation
Indoor
61 (200)
Outdoor
61 (200)
152 (500)
152 (500)
or Load Shed Kit
per Run
2 Modules
3 Modules
31 (100)
21
31 (100)
21
152 (500)
122 (400)
152 (500)
152 (500)
TP-6984
)
(67)
(67)
5/17a