AQC MAXIPLY DMP-170S Owner's Manual - Page 13
Browse online or download pdf Owner's Manual for Dust Collector AQC MAXIPLY DMP-170S. AQC MAXIPLY DMP-170S 20 pages. Open type dust collector
Multiple pocket type dust collector
The fan starter is not supplied by A.Q.C. Inc. Contact A.Q.C. Inc. for information on the proper
starter for your dust collector.
The electrical panel may be installed directly on the Maxiply unit or remote.
Once all electrical connections have been completed, switch "ON" the motor and check for proper
blower wheel rotation.
7.3
Ducting systems
•
The dust collector should be installed as close as possible to the machines creating the dust.
This is to minimize the length of the ductwork.
•
If possible, do not install short radius elbows or bends.
•
Install taps or branches having a 30 degree slope or less.
•
Do not install straight 90 degree taps (T's).
•
Join ductwork and branches using self tapping screws and silicone. Preferred ducting system
is clamp-on type not requiring any screws causing possible jams and dust build-up at the
screws.
8 START-UP
8.1
Check list
Before starting the dust collector for the first time, the steps listed below should be followed to
ensure the collector will work properly.
•
Remove all objects in the vicinity of the collector inlet and outlet.
•
Ensure all accessories and optional equipment are secured and installed correctly.
8.2
Shaker system
•
Check if the upper filter frame is well in place and fastened correctly.
8.3
Electrical connections
WARNING!
The electrical connection must be performed by a certified
electrician and by applying local building rules and
regulations. For safety measure, disconnect all electrical
power prior to installation.
13