AQC MAXIVIBE AMV-350 Owner's Manual - Page 7

Browse online or download pdf Owner's Manual for Dust Collector AQC MAXIVIBE AMV-350. AQC MAXIVIBE AMV-350 20 pages.

AQC MAXIVIBE AMV-350 Owner's Manual
Shaker type dust collector

ASSEMBLY

8
8.1
Necessary tools
The following tools and equipement are recommended for the assembly of the dust collector :
• Crane or fork lift
• Swing jib
• Chains
• Shackles
• Eye bolts
• Tapered steel pins
• Ratchet set
8.2

Fitting

 1. Prepare the area where the collector is to be installed. Ensure the area is clear of any obstacle
or debris.
 2. Using eye bolts and shackles, lift the dust storage compartment over the area where the
collector is to be installed and gently lower into place.
 3. Once this section is firmly into place, use a level to ensure the collector is straight. Install
anchor bolts to secure the collector to the ground.
 4. Install a grounding wire.
Apply two (2) strips of adhesive on the flat part of the dust
storage compartment, one (1) strip outside of the holes and
the other inside of the holes (figure 3).
• Spanners and/or wrenches
• Power drill
• Concrete drill bits
• Concrete anchors
• Nuts, washers and bolts
• Self tapping crews
• Silicone tubes
WARNING!
7