A.B.S. Flexilo MINI Assembly-, Operating-, And Filling Instructions - Page 14
Browse online or download pdf Assembly-, Operating-, And Filling Instructions for Industrial Equipment A.B.S. Flexilo MINI. A.B.S. Flexilo MINI 19 pages. For wood pellets. construction: plug-in system galvanized
Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets
Scope of delivery
4.2 Optional Accessories
Depending on boiler-type resp. on the conveying system of the heating system; different
extraction systems are offered for the Flexilo MINI for wood pellets.
Pos. Illustration
1
2
Optional accessories
Pay attention to the installation notes for screws and spiral conveyors, avoid bends
and radii, transfer stations and long transport distances.
With suction conveyor systems it is important to pay attention to the maximum
conveying distance. Mostly < 25 m. Ascends in the conveying line have a positive
effect on transport.
Heed the assembly instructions of the respective conveyor systems.
When the exhausting box will be installed the suction hoses are supposed to be laid
on top of each other.
Subject to technical change
©A.B.S. Silo- und Förderanlagen GmbH
Description
Exhausting box
For direct access of the suction-hoses from
the suction-blower. This system does not work
with all suction-blowers.
Accessories: Tension band, Tension ring,
Bottom-part of the box, Upper-part of the box
Screw boxes
To adapt different screw systems
Accessories: Tension band, Locking-gate-
valve
Issue 09/2016
Page 14 of 19