A.B.S. Flexilo MINI Assembly-, Operating-, And Filling Instructions - Page 17

Browse online or download pdf Assembly-, Operating-, And Filling Instructions for Industrial Equipment A.B.S. Flexilo MINI. A.B.S. Flexilo MINI 19 pages. For wood pellets. construction: plug-in system galvanized

Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets
Assembly

5.3 Fixation

Tighten the screw connections strongly.
Fix the frame on the ground.
Ground all steel parts, as described in chapter "Grounding".

5.4 Assembling the extraction devices

Finally, you must mount the extraction system supplied with the silo (suction box, screw box).
The extraction unit should show in the direction of the boiler. This is especially important with
rigid augers
Exhausting box
Screw box
Extraction systems
The silo removal units shall be NEVER fastened to the floor as this can lead to sound
transmissions during removal.
All removal units have an emergency or locking gate to remove the dust part regularly.
Subject to technical change
©A.B.S. Silo- und Förderanlagen GmbH
The exhausting box consists of two parts: the upper section
with emergency slide gate and the lower section with the
discharge neck.
Using the clamp ring provided, connect the upper and lower
sections together such that the pressure relief device points in
the direction of the extraction line.
Place the unit on an assembly aid.
Pull the silo outlet over the upper beaded rim of the upper
section and secure it above the seam with the tension band.
The extraction hose must be attached to the lower neck and the
return air hose to the upper neck.
If it is necessary to adjust the extraction rate, close the
emergency slide gate, use the suction blower to start a flow of
pellets and slowly open the emergency slide gate. Upon
reaching a satisfactory pellet flow rate, leave the emergency
slide gate in the current position.
If possible with regard to the conveying rate, remove the
emergency slide gate completely and close off the slot with a
piece of tape.
Pay special attention to proper adjustment of the cyclone flap
on the suction blower
Use a similar procedure with a screw box.
Place the unit on an assembly aid.
Pull the silo outlet over the upper beaded rim and secure it
above the seam with the tension band.
Augers or spiral conveyors as well as other special inserts from
various manufacturers can, upon approval, be installed in
different auger feed boxes.
Issue 09/2016
Page 17 of 19