Dexter Laundry COIN COMPACT DRYER Operator's Manual - Page 5

Browse online or download pdf Operator's Manual for Dryer Dexter Laundry COIN COMPACT DRYER. Dexter Laundry COIN COMPACT DRYER 17 pages.

INSTALLATION AND OPERATING INSTRUCTIONS
This dryer may have been supplied as part of a washer/dryer stacked
appliance. If so, refer to the washer instructions for uncrating and hard
mounting the stacked unit to a concrete floor and observe the dryer clearances
listed below.
UNCRATING AND PLACING DRYER (Stand alone dryer unit):
Tools Required: ½ in. hex socket and ratchet driver, wood block 4 in. or 5 in. (102-127 mm)
thick, a knife and a groove joint pliers, which will open to 1 3/8 in. (35 mm).
1. Remove and discard stretch-wrap, posts, cap and inner packing.
2. The crate base is attached to the dryer by (4) cap screws driven upward from below the crate
base. Remove crate base from dryer, by tipping dryer sidewise and place block under crate base
rail in center of dryer. Using a ratchet and ½ in. hex socket, remove and discard (2) crating bolts
from side, which is raised. Remove block from under crate base. Repeat for other side.
3. Install the leveling legs, which are shipped inside the dryer drum. Using a walking motion,
move dryer sideways about 6 in. (152 mm) off crate base. Tip dryer up and place block under
edge of dryer. Thread two leveling legs about two-thirds into the T-nuts on the base from which
the crating bolts were removed. Remove block from under dryer.
With a walking motion move dryer completely off crate base. Discard crate base.
Tip dryer sidewise, as previously done, and place block under edge of dryer on raised side.
Thread leveling legs into nuts as was done for the first side.
Slide unit into position where it will be installed. Adjust leveling legs, using the groove joint
pliers, to level and align dryer with adjacent units.
DRYER INSTALLATION
1. CODE CONFORMITY: All commercial dryer installations must conform to the local and
national codes for the location of installation.
2. INSTALLATION CLEARANCES: This unit may be installed at the following alcove
clearance.
I. Left Side
II. Right Side 0
III. Back
IV. Front
0
18 in. (457 mm) clearance is necessary behind the motors to allow
servicing and maintenance.
48 in. (1220 mm) to allow use of dryer.
5