Aqua Creek Products F-EZPL2 Installation, Assembly And Operating Instructions - Page 8

Browse online or download pdf Installation, Assembly And Operating Instructions for Lifting Systems Aqua Creek Products F-EZPL2. Aqua Creek Products F-EZPL2 12 pages. Pool lift and hard seat option
Also for Aqua Creek Products F-EZPL2: Manual (11 pages), Manual (12 pages)

Aqua Creek Products F-EZPL2 Installation, Assembly And Operating Instructions
STEP 5:
Locate the chain assembly and insert each "S"
hook into the holes in the sling support bars (A).
Attach the hanger to the boom eye on the lift (B).
Attach the chain links to the hanger (C) so that
the sling is at the appropriate height to allow the
user easy access and so that the sling will clear
your pool wall (if applicable).
Assembly is complete. Prior to lifting any
persons in the lift, it is highly recommended that
the lift is operated at least once without a load to
check for proper functioning and that the
instructions for operating the lift be read and incorporated into a training program for the
persons who will be operating the lift.
EZINST-11/22/10
© Aqua Creek Products LLC 2003-2010
B
C
A
Page 8 of 12