Aqua Creek Products Power EZ F-333PEZNA Manual - Page 6
Browse online or download pdf Manual for Lifting Systems Aqua Creek Products Power EZ F-333PEZNA. Aqua Creek Products Power EZ F-333PEZNA 13 pages. Pool lift
TOOLS REQUIRED:
9/16" WRENCH
1/8" HEX KEY
The Power EZ Pool Lift arrives with the boom arm attached
to the mast. To complete the assembly, layout all parts on a
large, clean area.
STEP 1. Attach the control box to the lifts mast using the
supplied hose clamps and a fl athead screwdriver.
STEP 2. Connect the lower end of the electric actuator to
the mast (vertical post) with one (1) 3/8" x 1 3/4" hex bolt,
two (2) 3/8" fl at washers and one (1) 3/8" nylock nut.
STEP 3. Connect the upper end of the actuator to the
boom arm with one (1) 3/8" x 1 3/4" hex bolt, two (2) 3/8" fl at
washers and one (1) 3/8" nylock nut.
STEP 4. Slide the lift into the previously installed anchor
socket. Make sure that the mast is seated at the bottom of
the anchor. Check to ensure easy rotation of the lift inside
the nylon-lined anchor sleeve.
NOTE: Three (3) zip ties shipped with the Power EZ Lift.
These are meant to secure excess actuator cable. Failure to
complete this may cause a tripping hazard. See the pictures
below on how to attach the cable to the lift.
6
Copyright © 2016 Aqua Creek Products All Rights Reserved
Assembly Instructions
3/4" WRENCH
FLATHEAD SCREWDRIVER
STEP 1
CONTROL BOX
AND BRACKET
HOSE
CLAMP (2)
CONNECT TOP
AND BOTTOM
TABS TO THE
HOSE CLAMPS
STEP 2
3/8" X 1 3/4"
HEX BOLT
3/8" FLAT
WASHER (2)
MAST
STEP 3
3/8" FLAT
WASHER (2)
3/8" X 1 3/4"
HEX BOLT
Revised 2/24/16
3/8"
NYLOCK
NUT
BOOM
ARM
3/8"
NYLOCK
NUT
ACTUATOR