DeZurik KGC-MC Instructions Manual - Page 14
Browse online or download pdf Instructions Manual for Control Unit DeZurik KGC-MC. DeZurik KGC-MC 17 pages. Metal cutting knife gate valves
DeZURIK
KGC-MC METAL CUTTING KNIFE GATE VALVES
Replacing the Clip
8. Thread the clip into the pneumatic actuator's piston rod up to the jam nut but also ensure that the clip
opening lines up to the gate.
9. Extend the actuator to the gate, align the clip and gate holes and install the shoulder bolts. Tighten
the nuts onto the shoulder bolts and tighten the jam nut.
10. Retract the actuator and ensure the gate is retracted just out of the flow path. If the gate is in the flow
path, the shoulder bolts will have to be removed and the clip will have to be adjusted by threading it
further onto the piston rod. Reattach the clip to the gate following the steps above.
Purge Port Option
When purge port option is ordered as, the installer will connect purge lines.
WARNING!
If pipeline is under pressure with purge port plugs in place, release line pressure
before removing plugs. Serious or fatal injury may occur if line is under pressure.
Installation:
1. Remove all purge plugs after valve has been installed in line and before line is pressurized.
2. Connect proper purge line to the ports.
3. Pressurize purge lines and check for leaks.
4. Pressurize pipe line.
See Figure 8 for purge port sizes and locations.
D11060
continued
Page 14
November 2020