Aqua Lung Titan Technical Bulletin - Page 3

Browse online or download pdf Technical Bulletin for Controller Aqua Lung Titan. Aqua Lung Titan 4 pages. Second stage
Also for Aqua Lung Titan: Service Manual (19 pages), Maintenance Manual (20 pages)

Aqua Lung Titan Technical Bulletin
Aqua Lung America
10
Push the crown (10) into
the larger threaded end
of the crown holder (8). Using
the seat installation tool (pn
127686), engage the crown and
turn clockwise until the tool dis-
engages from the crown. This is
the pre-set for the crown.
11
Fit a new MP seat (18) into the poppet (19). Replace the
entire valve insert assembly (18-24) into the case (5).
12
While holding the valve insert assembly (18-24) inside the
case (5), hold the lever (22) down and thread the crown
holder assembly (8-14) clockwise into the valve insert until the tab
on the ring locker (14) locks into the notch on the case.
13
Slide the tab on the ring locker (14) out of the notch on the
case (5) and rotate the crown holder (8) one more revolution
until the ring again locks into the notch. Confirm the crown holder
will not turn anymore.
CAUTION:
Failure to perform this last step and tighten the crown
holder all the way will cause a leak at first pressurization.
ADJUSTING LEVER HEIGHT
14
Attach the swivel end of the MP hose (28) to the second
stage by turning the swivel nut clockwise until it is secured
in place by the hose locker (12). Finally, attach the first stage to a
test bench or a fully charged 3000 psi (206 bar) cylinder. Slowly
pressurize the first stage.
15
Using the crown/lever adjustment tool (pn 125727), slide the
tool across the top of the case (5). The lever (22) must
touch the cutout on the tool without causing any air loss. This
lever setting is 2.5mm above the case edge. If the second stage
leaks the lever is set too high, use a ¼" nut driver to adjust the lock-
nut slightly CCW. If the lever is not touching the cutout in the tool it
is too low, turn the locknut CW to raise it. Once the lever height has
been confirmed, turn off the air supply and purge the regulator and
remove the MP hose (28) from the second stage.
16
Insert the venturi knob (17) into the opening on the right side
of the case (5) with the locking tab facing upward.
17
Insert the venturi (4) into the cutout in the venturi knob (17).
You should hear it "click" as the venturi locks into place.