ABACUS Aquanova Scorpio 1700 Information Pack - Page 6

Browse online or download pdf Information Pack for Bathtubs ABACUS Aquanova Scorpio 1700. ABACUS Aquanova Scorpio 1700 18 pages. Fixed seat & transfer system

ABACUS Aquanova Scorpio 1700 Information Pack
Pre - Installation Requirements
ELECTRICS
1.
The bath should be connected via a 5 Amp IP65 rated switched fused spur unit, with
2m of 1.5mm 3 core round ex trailing. Located at the tap end of the bath,
positioning and speci cation to be in accordance with IEE regulations.
The Spur box should be mounted between 300-500mm o the oor.
2.
Where a whirlpool is tted a 13 Amp IP65 rated switched fused spur is
required in addition.
Electrical Connection & Earth Bonding
A 30mA RCCD or RCBO is required in compliance in accordance with 17th Edition IEE
regulations. This should be located just outside the bathroom or on the consumer unit
covering that area of the building.
Earth Bonding and Cross Bonding are to be tted and tested for continuity in
accordance with IEE regulations.
The trailing ex should be protected by use of exible conduit.
Image for Plumbing and Electrical Supplies
(Reference purpose only) - Side and End wall feeds
6