Allied Telesis AT-RH505BE Quick Install Manual - Page 4

Browse online or download pdf Quick Install Manual for Switch Allied Telesis AT-RH505BE. Allied Telesis AT-RH505BE 8 pages. Micro hubs

Allied Telesis AT-RH505BE Quick Install Manual
BNC
BNC Port - Connect
RJ45 Ports (1-4) - Connect
a thin coax segment
workstations or other devices
to this port
that use twisted pair cabling
Desktop and Wall Installation
To install a single AT-RH500 Series hub either with the Velcro kit or on
the desktop, do the following:
1.
For wall installation, place two Velcro pads on the bottom of the
unit, then place the other pads on a wall. Align the unit's Velcro
pads with the two pads on the wall to attach the unit to the wall.
For desktop installation, attach the four rubber feet to the bottom
of the unit. Then place the hub on a secure desktop.
Caution
Air vents must not be blocked and must have free access to the
room ambient air for cooling
2.
Plug the power supply into a wall socket and connect the DC cable
to the unit. Check the LEDs to ensure that the PWR LED lights.
See Table 1.
3.
Connect the twisted pair cables to the hub's RJ45 ports. Connect
the other ends of the twisted pair cables to the computer's network
adapter card.
Figure 1 Standalone Hub Installation
NOTE: Cable length must not exceed 100 m (328 ft).
4X
3X
2X
page 13.
B N C
8X
7X
6X
5V 1.2A
1X
Power - Use adapter
shipped with hub
5X
4X
3X
2X
1X
5V 1. 2A
4