CPG G24 Installation And Operation Instructions Manual - Page 5
Browse online or download pdf Installation And Operation Instructions Manual for Grill CPG G24. CPG G24 15 pages. Countertop grill
- 1. Table of Contents
- 2. Safety Precautions
- 3. General Installation Instructions
- 4. Specifications & Dimensions
- 5. Conversion
- 6. Lighting Instructions
- 7. Operating Instructions
- 8. Cleaning & Maintenance
- 9. Troubleshooting
- 10. Explosion View Drawing
- 11. Spare Part List
- 12. Spare Parts List
- 13. Limited Warranty
These instructions are for the conversion from Natural Gas to Propane (L.P.) on all models. The
conversion should be done before connecting the unit to the gas supply.
Units are shipped from the factory equipped for use on natural gas. Orifices necessary for LP
(propane) are provided in a bag tied to the valve on the front panel.
1. Remove the knobs and front panel.
1. Remove the knobs and front
panel.
Note: Unit Number on side
of orifice fittings.
Regulator with brass cap
CONVERSION (Manual Control)
Plastic Insert
L.P Position of insert
5
2. Unscrew bolts and pilot valve,
2 . Uns
then remove the manifold.
3. Replace the orifice
fittings into the valve.
4. Install the front panel
5. Before installing the regulator,
unscrew the octagonal cap, up you can
read (NAT) on the plastic insert out of
the cap, flip it over and snap back in
place. You can now read (L.P).
6. Continue with
installation.
knobs