Allied Telesis Switch Controller Quick Install Manual - Page 6
Browse online or download pdf Quick Install Manual for Switch Allied Telesis Switch Controller. Allied Telesis Switch Controller 12 pages. Allied telesis, inc switch controller quick install guide
6
7.
Prepare the switch controller bay
Remove the switch controller bay faceplate or existing switch controller
To remove a bay's faceplate:
Loosen the faceplate's two Phillips mounting screws until they disengage
from the chassis, then remove the faceplate.
Keep the faceplate for future use. If you should remove a switch controller, replace the
faceplate to prevent dust and debris from entering the chassis and to maintain proper
airflow.
The switch may overheat or be damaged by dust and debris if bays are left
uncovered.
To remove an existing switch controller:
Loosen the switch controller's two Phillips mounting screws until they
disengage from the chassis.
Move the switch controller's ejector levers to the unlocked position (see
Figure 3 on page -6).
Slide the switch controller out of the chassis, keeping the controller in a
straight alignment so it doesn't jam.
Figure 3: Ejector levers.
8.
Insert the new switch controller
Make sure the switch controller's metal back-panel is aligned with the card
guides (see Figure 4 on page -7).
Switch Controllers are mounted vertically in the SwitchBlade 8 (AT-SB4108) chassis
and horizontally in the SwitchBlade 4 (AT-SB4104) chassis.
With the ejector levers in the unlocked position (see Figure 3 on page -6),
carefully slide the switch controller into the chassis.
The ejectors' locking mechanisms should align with their slots in the
chassis (see Figure 5 on page -7).
SwitchBlade Switch Controller
C613-04031-01 REV B