Avtron K711 Manual - Page 9
Browse online or download pdf Manual for Industrial Equipment Avtron K711. Avtron K711 17 pages.
Installation
Avtron Load Bank • Part Number K711D36027
LOAD CONNECTIONS
Load connections are made to the main line power distribution bus bars. (Refer to Outline Drawing
SB2203.) The connections are marked A, B, and C. Cables to the Load Bank should be of adaquate
size to handle maximum rated load according to the National Electrical Code and any local codes.
The ampacities of these load connections are shown on the Load Bank schematic diagram, D36028.
GROUNDING
A permanent ground conductor must be connected to the Load Bank enclosure by an individual
ground wire to prevent a potential above ground on the enclosure. This ground conductor should be
run with the load power conductors to provide the lowest impedance fault path. The ground stud
must be connected to both the power source frame and to a good earth ground. The ground
conductor should be sized per the National Electrical Code Section 250-95, if not superseded by
local codes.
3-4