Dell PowerEdge 2800 Conversion Manualline - Page 19

Browse online or download pdf Conversion Manualline for Server Dell PowerEdge 2800. Dell PowerEdge 2800 36 pages. Poweredge 2800 server
Also for Dell PowerEdge 2800: Information Update (24 pages), Installation Manual (22 pages), Manual (44 pages), Hardware Installation (14 pages), Quick Reference (2 pages), Specifications (2 pages)

Dell PowerEdge 2800 Conversion Manualline
Y1001bk0.book Page 17 Thursday, July 8, 2004 4:32 PM
Figure 1-8. Installing Shoulder Nuts

Removing the Rack Doors

You must remove the doors from the rack cabinet to provide access to the interior of the rack and to
prevent damage to the doors while installing the system in the rack cabinet.
See the documentation provided with the rack for instructions on removing rack doors.

Installing the System in a Rack

If you are installing the system in a rack cabinet, see the procedures contained in the system Rack
Installation Guide.

Installing the Cable-Management Arm

See the procedures contained in the system Rack Installation Guide.

Routing Cables

See the procedures contained in the system Rack Installation Guide.

Installing the Rack Bezel

To install the bezel, hook the right end of the bezel onto the chassis, then fit the free end of the
bezel onto the system. Secure the bezel with the keylock. See Figure 1-9.
Tower-to-Rack and Rack-to-Tower Conversion Guide
shoulder
nuts (6)
17